Scaffolding Assembly
Details
| Wooden Planks / Sole Plate Clean site and lay the wooden planks at the ground in horizontal position |
|---|
| Jack Base It is a seat for adjusting the required scaffolding level above the wooden planks |
| Main Frame Insert the main frame into jack base section in perpendicular |
| Cross Base For fixing the main frame in each span of scaffolding |
| Arm Lock It is being used to hold frames between lifts to prevent uplifting |
| Joint Pin Insert onto the top of main frame for fixing the upper frame |
| Horizontal Frame / Walking Board It is a lateral pipe frame used to hook onto the main frame |
| Wall Tie Use wall tie to prevent the frames from tilting or collapsing |
You may also like